Photo Gallery > Heavy Marine "U" Pipe 316 s/s
-
Heavy U Pipe 02
Before processing as received from client.
-
Heavy U Pipe 03
Before electropolishing as received from client picture taken with flash.
-
heavy u pipe 05.jpg
Close up of "U" end. Before
-
Heavy U Pipe 04
Close up before corrosion enhancement processing.
-
Heavy U Pipe 06
Extracting from processing tank.
-
Heavy U Pipe 07
Close up of "U" end while extracting from processing tank.
-
Heavy U Pipe 01
Moving work piece to transport truck. Note: carbon steel forklift forks are insulated to prevent iron transfer that can lead to contamination corrosion.
-
Heavy U Pipe 08
Length section after processing
-
Heavy U Pipe 09
After electropolishing.
-
Heavy U Pipe 10
After corrosion prevention processing.
-
Heavy U Pipe 11
After ep'ing.
-
Heavy U Pipe 12
After electropolishing "U" section close up. Note: 3 welds are now visible possibly due to metallurgical differences of work piece and weld rod used.
-
Heavy U Pipe 13
After processing.
-
Heavy U Pipe 14
After electropolishing.
-
Heavy U Pipe 15
Surface close up after electropolishing. Note: surface is now micro-deburred. Burrs were created during manufacturing by aggressive angle grinding. (speckle finish is original mill as received)